More than 5 thousand connections to the infrastructure of “Roseti Novosibirsk” were made in 9 months

Technological connection to the power grid infrastructure in the territory of the Novosibirsk region is in steady demand, it is this process that triggers the further development of the economy and social well-being in the region. Every year, Rosseti Novosibirsk (JSC “RES”) observes an increase in the need to connect new facilities.

During the past 9 months of 2024, energy companies have already completed 5,000 connections to their power grid infrastructure with a total capacity of 187 MW. The company provided power supply to a wide variety of facilities – from the industrial site of the solid household waste sorting plant in the Verkh-Tulinsky Rural Council with a load of 500 kW to a whole complex of socially significant facilities. Among them are 13 paramedic-midwifery points, 10 schools, a surgical building with a polyclinic in Berdsk and a polyclinic in Novosibirsk.

At the same time, during the reporting period, “Rosseti Novosibirsk” concluded another 5,379 contracts with a total capacity of 296 MW. Specialists should prepare electrical networks for connecting a number of large objects – for example:

  • production site of Novosibirsk KBC with a load of 1.7 MW,
  • of the 1st stage of the integrated development of the “Territory of innovative and scientific and educational activity “SmartCity-Novasibirsk” with a load of 5 MW,
  • a production site of a Russian pharmaceutical manufacturer with a load of 1.5 MW,
  • center of preclinical research FBUN SSC VB “Vektor” of Consumer Care with a load of 4.5 MW.

The Novosibirsk Region maintains a stable dynamic of development and occupies one of the leading positions in terms of construction volume in Siberia. And modern construction, first of all, needs a reliable power supply, so the portfolio of the power grid company has quite a lot of housing construction facilities. According to the results of 9 months, about 40 connections of apartment buildings with a total load of about 15 MW have already been completed, and more than 60 new contracts for 50 MW have been concluded.

And this is far from a complete list of objects in the region, which “Rosseti Novosibirsk” managed to provide and plans to provide reliable and uninterrupted power supply. And for the convenience of interaction with customers from various industries and categories, the company continues to work on improving customer services, shortening the terms of technological connection and the number of stages for connecting the object to electrical networks.

Leave a Comment