The company’s specialists have developed optimal technological solutions that allow to ensure optimal conditions of reliability and quality of power supply of this socially significant facility. Power engineers have planned more than 600 kW of power and prepared 2 intelligent metering systems for installation.
The new educational institution will be located next to the already built school #220 and will have 1100 places. The project of the five-story building of the educational institution includes an assembly and sports halls, a dining hall, an atrium with a stage, a library, and a cinema hall. On the territory of the school there will be a public stadium with running tracks and stands for spectators, linear park, greenery and workout areas. The construction of the facility is planned to start already this year.
Thanks to the integrated approach of the energy engineers, it is possible to ensure the full functioning of new modern schools, which are especially relevant for the actively expanding wood massifs.
Similar projects are only a small part of the objects that “Rosseti Novosibirsk” plans to provide with reliable and high-quality electricity supply. The company, being a system-forming power grid enterprise of the region, carries out technological connection of large production sites, agricultural enterprises, housing construction facilities and medical institutions. Many of the projects are implemented within the framework of state programs and national projects.